Solar Panel Installation Processes: What To Expect Generally, installation of residential solar power systems and panel activation follow this simple process: 1. Site Inspection and Design. Time Frame: 1-4 weeks. This phase starts with an on-site inspection, where a professional contractor will review your property to obtain a better understanding of what you need.
Once the inspection is over, you will be given the green light by your contractor to proceed with the design phase. Explore more about the number one  blue raven solar panel installers here.


Most contractors use CAD software to design the system. It will include shading, mounting positions and any other special requirements such as tiebacks. These are temporary measures to create an aesthetically pleasing setup on your roof. After you and your contractor have finalized the design, they will come back to your house for actual solar panel installation.
In order to achieve the highest solar panel efficiency during the panel's lifetime, it is imperative that you choose an effective, long-lasting mount. This may require some modifications to your roof structure or shingles. For example, you can opt to replace all of your roof shingles or install metal pergola instead of roof shingles to save even more money on energy costs. The important thing to remember is that you will want to choose a long-lasting, strong mounting system in order to maximize the energy output of your solar panel system.



Solar Panel Installation Location: Avoid placing your solar panels in shady areas. Solar energy is tremendously affected by the temperature of the surrounding area, so it would be wise to invest in a weatherproof setup. If you live in an area that has a chilly climate, installing your solar panels in a sheltered location such as on top of your garage roof or a side table in your kitchen would be a good idea. You can also use a flat roof over a shady spot in order to reduce your installation costs. Your chosen installer will be able to give you the best tips and advice in regards to the optimal placement of your solar panels.



Electrical Panel Location: Before you can begin your solar panel installation, you need to carefully measure the area that you will be powering with your electric vehicles. Do not place your new solar panels on the flat surface of your roof as this will interfere with your electric vehicle's ability to generate power. Your chosen electrical panel installer will be able to advise you on the best option to installing your new electric vehicle solar panel array. Remember, you do not want any type of voltage to flow through your power meter.  If you probably want to get more enlightened on this topic, then click on this related post: https://blueravensolar.com/indiana/indianapolis/.


The final step of the solar panel installation process is the thermal insulation. After you have successfully installed your solar panels, you must insulate the panels from the cold of winter and the heat of summer. This will ensure that your solar energy system does not have to work as hard in order to maintain your solar power supply. Thermal insulating materials are typically placed on the inside of the panels where the panels normally touch the ground, or between the solar cells. To familiarize yourself more with this topic, it is best that you check out this post: https://en.wikipedia.org/wiki/Solar_panel.

I BUILT MY SITE FOR FREE USING